Air conditioning shut-off valve

Air conditioning shut-off valve

Professional Air Conditioning Shut-Off Valve

Our AC shut-off valves are critical components designed for **safe isolation of refrigerant flowduring system maintenance, repair, or component replacement. These valves provide technicians with **quick, leak-free shutoff capability while protecting the system from refrigerant loss and contamination.

Send Inquiry
Add To Cart

Product Introduction


Professional Air Conditioning Shut-Off Valve

Our AC shut-off valves are critical components designed for **safe isolation of refrigerant flowduring system maintenance, repair, or component replacement. These valves provide technicians with **quick, leak-free shutoff capability while protecting the system from refrigerant loss and contamination.

Key Features:


✔ **Durable brass/copper construction** for long service life
✔ **Positive shut-off** with quarter-turn operation
✔ **R22/R134A/R410A compatible**
✔ **Schrader valve access port** for pressure testing
✔ **Brazed or flare connections** available
✔ **Serviceable design** with replaceable seals

Technical Specifications:


Materials:** Brass body, PTFE seals, chrome-plated stem
Pressure Rating:** 600 PSI at 150°F (65°C)
Temperature Range:** -30°F to 250°F (-34°C to 121°C)
Connection Types:** 1/4″ to 3/4″ SAE flare or sweat
Certifications:** UL/CE compliant

MORE PRODUCT RECOMMENDATIONS

Applications:


– Residential and commercial AC systems
– Heat pump service ports
– Refrigerant recovery stations
– System maintenance and repair

PRODUCT SHIPPING PACKAGING

FAQ

Q1: How is quality ensured?

A1: we have a one year quality warranty B L issue date. If the product does not work property as described, and the problem is proven to be at our fault, we will provide exchange services for the same specific item.

Q2: Do you provide OEM or ODM service?

A2: Yes. We can produce G-air standard products under customer brand or modify the products to satisfy customers personalized requirements, or work together with customer to design and produce a totally new products.

Q3: How long can I get the feedback after sending the inquiry?

A3:Usually you will get feedback within 30 minutes during the office hours and 12 hours after office hours.

Q4: How long is the production lead time?

A4: Usually the production lead time will be 20 days once order confirmed. Sometimes we have a few.

Q5: How do you make our business long-term and good relationship?

A5: We keep good quality and competitive price to ensure our customers benefit , We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

 

Hot Tags: